Fees
Fee and charges are calculated at two stages based on the relevant by-laws.
At the time of submitting an application, a portion of the application fee is due, this is referred to as the base fee and is calculated based on the Township of Norwich Building By-law. The base fee is intended to cover the initial costs associated with reviewing the application.
Once the review of an application is completed, the remaining fees and charges are calculated, and the applicant is notified prior to issuance of the permit.
The applicable fees and charges vary between projects. A list of fees and charges that may be applicable are provided below.
-
- Permit Related Fees (attached fee schedule from Building By-law)
- Development Charges (attach schedule of development charges)
- Water & Sewer Fees (attach water meter fees and connection fees)
- Refundable Deposits (attach schedule of deposits from Building By-law)
Please contact the Building Services Department questions regarding fees that may be applicable to a specific project.
Note: Accepted methods of payment are in person via cash, debit or cheque.
| Class of Permit | Construction Type | Base Fee (paid at application) |
Adjustment Fee (paid prior to issuance) |
| Residential Construction | |||
| New residential | Group C, Low Density Residential: Single or Semi-Detached, Duplex, Triplex, incl. on-site constructed Tiny Home (New and Additions) | $1,181 | Base fee + $0.79/sq.ft of occupied/finished floor area (See also attached garages and decks – no additional base fee added where attached to dwelling) |
| Group C, Medium Density Residential: Multi-unit, and townhouses/apartment dwellings < 6 storeys/< 600 sq.m, all group homes including retirement homes | $3,221 | Base fee + $0.79/sq.ft of occupied/finished floor area excluding parking structures (parking/storage structure to be calculated at $0.20/sq.ft of floor area) | |
| Group C, High Density Residential: Apartment (> 6 storeys), and wood-framed mid-rise apartments 4>6 storeys, all multi-unit Res. > 600 sq.m of building area | $4,295 | Base fee + $0.79/ sq.ft of occupied/finished floor area excluding parking structures (parking/storage structure to be calculated at $0.20/sq.ft of floor area) | |
|
Residential Buildings: Renovations, Alterations, Repairs, and Change of Use Migrant Worker Housing: New, Renovation and/or Repair |
Extensive renovations to ex. Dwelling, ARU’s and converted dwellings, tiny homes, migrant worker housing (bunkhouse < 10 occupants), or any change of use adding suites) | $805 | Base fee + $0.63/sq.ft of finished floor area > 592 sq.ft (55 sq.m) OR $14/$1,000 gross estimated construction cost (CBO’s Discretion) |
|
Basic renovations/alterations (<$15,000 value or < 55 sq.m) Attached or detached garage / carport / shops / misc. accessory structures > 592 sq.ft (55 sq.m) |
$429 |
Base fee + $0.43/sq.ft of finished floor area > 592 sq.ft (55 sq.m) OR $12/$1,000 gross estimated construction cost (CBO’s Discretion) |
|
| Decks/shed > 15 sq.m. / misc. accessory structures > 592 sq.ft (55 sq.m), accessory building renovations/alterations | $295 | Base fee + $0.44/sq.ft of building area | |
| Agricultural Buildings | |||
| New/additions to animal farm buildings (requiring NMA/MDS) | New/additions to animal and poultry housing units | $1,611 | Base fee + $0.17/sq.ft of building area > 1093 sq.ft (100 sq.m) |
| New/addition to manure storage facilities | $805 | Base fee + $0.11/sq.ft of building area > 1093 sq.ft (100 sq.m) | |
| New/addition/alteration to accessory farm buildings and structures (No NMA/MDS required) | Hay sheds, implement storage, repair shops, etc. | $644 | Base fee + $0.15/sq.ft of building area > 1093 sq.ft (100 sq.m) |
|
Grain bins, silos, horizontal bunkers, etc. Reno./repair/change of use to ex. farm buildings |
$429 | Base fee + $0.09/sq.ft of building area | |
| Institutional Buildings | |||
|
Institutional (Group A & B) |
New/additions | $3,221 | Base fee + $0.73/sq.ft of floor area >1093 sq.ft (100 sq.m) OR $24/$1,000 gross project value (CBO Discretion) |
| Renovations/alterations | $1,396 | Base fee + $0.56/sq.ft of floor area >1093 sq.ft (100 sq.m) OR $18/$1,000 gross project value (CBO Discretion) | |
| Commercial Buildings | |||
|
Commercial (Group D & E) |
New/additions | $1,611 | Base fee + $0.76/sq.ft > 1093 sq.ft (100 sq.m) OR $12/$1,000 gross project value (CBO Discretion) |
| Renovation/alterations | $966 |
Base fee + $0.28/sq.ft of floor area > 1093 sq.ft (100 sq.m) OR $12/$1,000 gross project value (CBO Discretion) |
|
| Industrial Buildings | |||
| Industrial (Group F) | New/additions | $2,255 | Base fee + $0.25/sq.ft of building area > 1093 sq.ft (100 sq.m) OR $12/$1,000 gross project value (CBO Discretion) |
| Renovation/alterations | $966 | Base fee + $0.19/sq.ft of building area > 1093 sq.ft (100 sq.m) OR $12/$1,000 gross project value (CBO Discretion) | |
| Miscellaneous | |||
| Demolitions | $161 | Base fee + $0.08/sq.ft where required to be engineered by Code | |
|
Signs, wood stoves Water/sewer connections |
$242 | Base fee + $0.49/sq.ft of sign area | |
| Conditional Permits | $752 | Base fee + $0.10/sqft of building area | |
| Tents & designated structures (non-wind towers) | $268 | Base fee + $0.21/sq.ft | |
| Wind towers | $1,558 | Base fee + $0.15/ft height of wind tower measured from base to hub | |
|
Occupancy permit (> 1 year since last inspection) |
$483 | N/A | |
| Moving building or temporary mobile home | $429 | Base fee + $0.56/sq.ft of building area OR $12/$1,000 (CBO Discretion) | |
| Permit renewal/revisions | $429 | N/A | |
| Sewage Systems | |||
|
Class IV and V – Small system (new or replacement), serving building(s) of any occupancy, where:
|
$1,181 | ||
|
Class IV and V – Large Systems (new or replacement) sefving building(s) of any occupancy, where:
|
$2,953 | ||
|
Existing Class IV and V Systems – Repair, alteration, extension Includes tank replacement/repairs |
$966 | ||
| Class II and III System New, replacement, alteration, repair | $752 | ||
The Township of Norwich imposes a development charge upon the development of any land within the municipality to assist with the costs of growth-related capital projects. Development charges play an important part in how growth-related infrastructure is financed. Each new or expanded residential and non-residential development requires increased municipal infrastructure and services to function efficiently and effectively.
Details of the current development charge rates for the Township of Norwich can be viewed on the Township of Norwich's Financial Services webpage.
The Township of Norwich also collects development charges on behalf of the County of Oxford, where applicable. Details of the current development charge rates for the County of Oxford can be viewed on the Oxford County's Development Charges and Fees webpage.
| Municipal Infrastructure Damage Deposit |
$600.00 where no sidewalk is involved $1,200.00 where a sidewalk is in place and/or work is being done within the right of way Permits issued within an urban and village area require payment of a damage deposit prior to issuance of the permit. Damage deposits are collected to support repairs where damage has occurred to municipal infrastructure as a result of the proposed construction or demolition. Damage Deposits will be returned upon verification by the Township Roads Superintendent or designate, subsequent to the completion of any work done on entrance culverts, curbs, gutters, or ditches that is deemed necessary and performed by the Corporation, less any amount that is expended by the municipality to make repairs or for cleanup. Where work has been done within the municipal lands, roads, etc., the |
| Lot Grading and Drainage Deposit |
When an Engineered Lot Grading and Drainage Plan is required, a deposit of $750.00 dollars shall be made.
The deposit may be used when the depositor does not complete the grading and drainage work in compliance with the approved Engineered Grading and Drainage plan. In such a case, the deposit shall be used in balance against the cost of any work to grade, drain, seed or sod the lot as necessary to conform to the approved plan, and the requirements of the Ontario Building Code. This deposit less any portion expended by the municipality to obtain
NOTE: The Lot Grading and Damage deposit provisions are not applicable where the Corporation and applicant have entered into a subdivision agreement, severance agreement or site plan agreement that specifies the terms and conditions of a deposit for work done by the Corporation on lot grading, entrance culverts or ditches. |
| Building Construction and Inspection Deposit |
The Building Construction and Inspection deposit is secured to ensure that all construction or demolition work commenced under a building permit, is completed, inspected, and finalized in conformance with the provisions of this by-law, the Ontario Building Code, and the Building Code Act. Value of deposits required (by type of use)
This deposit, less any portion expended by the municipality in enforcement of compliance, will be refunded without interest upon:
In the event that a building permit is revoked in accordance with Subsection 8.(10) of the Building Code Act, or where construction or demolition occurs in contravention of Subsection 8.(13) of the Building Code Act, the deposit shall be forfeited to the Corporation. The balance of the deposit shall be retained by the Corporation and dispensed to the Building Department Cost Stabilization Reserve Fund. |